[1]BIM and ANN-based rapid prediction approach for natural daylighting inside library spaces,Journal of intelligent & fuzzy systems, 2023,44( 2): 3285
[2]A Project Scheduling Game Equilibrium Problem Based on Dynamic Resource Supply. Applied Sciences, 2022, 12.
[3] A bi-level multi-objective location-routing model for municipal waste management with obnoxious effects. Waste Management, 2021, 135: 109–121.
[4] Conflict Resolution towards an Integrated Project Scheduling and Material Ordering System in a Large-Scale Construction Project. Applied and Computational Mathematics, 2019, 18(2): 202-217. (SCI)
[5] A multi-criteria decision making method for urban flood resilience evaluation with hybrid uncertainties. International Journal of Disaster Risk Reduction, 2019. (SCI/SSCI)
[6]A hybrid priority-based genetic algorithm for simultaneous pickup and delivery problems in reverse logistics with time windows and multiple decision-makers, Soft Computing, 2019. (SCI)
[7] A bi-level programming for transportation services procurement based on combinatorial auction with fuzzy random parameters. Asia Pacific Journal of Marketing and Logistics, 2018.30(5): 1162-1182. (SSCI)
[8] Stackelberg game optimization for integrated production-distribution-construction system in construction supply chain, Knowledge-Based Systems, 2018, 157:52—67. (SCI)
[9] Stackelberg-nash equilibrium for integrated gravelly soil excavation-transportation-distribution system in large scale hydropower construction project, Journal of Computing in Civil Engineering, 2016, 30(6): 04016024. (SCI)
[10] Two-stage based dynamic earth-rock transportation assignment problem under fuzzy random environment to earth-rock dam construction, Journal of Civil Engineering and Management, 2015, 21(6):775-797. (SCI)
[11] Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project, The Scientific World Journal, 2014. (SCI)
。。。。。。